2 STOREY SUPERLINK
Allure
Allure is the biggest double storey superlink in Setia Fontaines. The large space allows flexibility in interior designing, and all rooms are en suite.
Floor Plan
slide 3 of 8
PROPERTY SPECIFICATION
| STRUCTURE | Reinforced Concrete Frame |
|---|---|
| WALL | Brickworks with Plaster |
| ROOFING COVERING | Concrete Roof Tiles/Reinforced Concrete Roof |
| ROOF FRAMING | Lightweight Steel Trusses/Steel Trusses |
| CEILING | Concrete Slab/Plaster Ceiling with Paint |
| WINDOWS | Aluminium Frame Glass Window |
| DOORS | Timber Flush Door/Aluminium Frame Glass Sliding Door/Mild Steel Grille Door/ Aluminium Frame Louvers Door |
| IRONMONGERY | Approved Quality Lockset |
| ELECTRICAL SUPPLY | 3-Phase Power Supply |
| FENCING AND GATE | Brickwall with Mild Steel Fencing |
| EXTERNAL WALL | Plaster and Paint |
|---|---|
| INTERNAL WALL | Plaster and Paint |
| BATHS WALL | Tiles |
| KITCHEN WALL | Tiles/Plaster and Paint |
| Carporch, Apron, A/C Ledge, Store | Cement Render |
|---|---|
| Living, Dining, Kitchen, Staircase, Master Bedroom, Bedroom 2, Bedroom 3, Bedroom 4, Family, Yard, Terrace, Utility, Patio and All Baths | Tiles |
| Courtyard | Soil |
| Sanitary Fittings | Type H1 | Type H2 | Type H2a |
| Shower | 5 | 5 | 5 |
| Water Closet | 5 | 5 | 5 |
| Water Tap | 8 | 8 | 8 |
| Basin | 5 | 5 | 5 |
| Sink | 1 | 1 | 1 |
| Electrical Installation | Type H1 | Type H2 | Type H2a |
| Lighting Point | 35 | 35 | 35 |
| 13A Power Point | 25 | 25 | 25 |
| Fan Point | 8 | 8 | 8 |
| Air-con Point | 7 | 7 | 7 |
| Fibre Wall Socket | 1 | 1 | 1 |
| Heater Point | 5 | 5 | 5 |
| TV Point | 3 | 3 | 3 |
DEVELOPER: SETIA FONTAINES SDN BHD (505572-T) • Developer’s License No: 19732/05-2028/0714(R) • Validity Date: 19/05/2023 – 18/05/2028 • Advertising and Sales Permit No.: 19732-6/03-2027/0317(R)-(L) • Validity Date: 17/03/2026 – 16/03/2027 • Building Plan Approving Authorities: Majlis Bandaraya Seberang Perai • Building Plan Approval No.: MPSP/40/20-06/155 • Land Tenure: Freehold • Land Encumbrances: Public Investment Bank Berhad • Expected Date of Completion: December 2026 • Double Storey Terrace • Total units: 97 unit • Price: RM720,000 (min) – RM900,000 (max) • Double Storey Superlink • Total units: 30 unit • Price: RM876,000 (min) – RM972,000 (max) • Bumiputera Discount: 5%
Site Plan
Site Plan
Setia Fontaines, a 1,691 acres mega township masterfully planned for a good life. A world class development located at the heart of North Seberang Perai featuring:
- 37 acres Townpark
- 63 acres Lake
- 8.8km Waterway
- 9 Heritage Themed Fountaines
- Interconnected Islands with Integrated Joggin Path & Cycling Track
Location
Location
Setia Fontaines is a latest city development, which is easily accessible via major roads and highways. It is located within a walking distance from upcoming developments including:
- Setia IWC
- City Centre Business Hub
- Setia Experience Centre
- Waterfront Lifestyle Centre
- Heritage Park
- Northern Malaysia's First & Largest Musical Fountain
| SJKC Pei Yu - 8 KM |
| SJKC Kai Chee - 14 KM |
| SJKC Kai Chee - 14 KM |
| SMK Sains Kepala Batas - 4 KM |
| Kolej Matrikulasi Pulau Pinang - 10 KM |
| Institut Latihan Perindustrian - 4 KM |
| Maktab Rendah Sains MARA - 4 KM |
| Universiti Sains Malaysia (USM) - 5 KM |
| Universiti Teknologi Mara (UiTM) - 5 KM |
| Lotus's Hypermarket |
| Sunshine Shopping Mall |
| Mydin Hypermarket |
| Hospital Kepala Batas |
| Proposed Bertam Specialist |
| Heritage Park - Located within a short walking distance away, is adorned with a magnificent lake and iconic landscape. |
| Bertam Golf Club |
| KTM Tasek Gelugor |
| North -South Highway |
| Butterworth-Kulim Expressway |
| Butterworth Outer Ring Road |
| Penang Bridge |
| Proposed 3rd Link |
Gallery
Site Progress
Amansara North Phase 1 - Certificate of Completion and Compliance obtained on March 2025.
Amansara North Phase 1 - Certificate of Completion and Compliance obtained on March 2025.
Amansara North Phase 2 - The Drains Serving the said Building in Progress as at April 2026.
Amansara North Phase 2 - The Drains Serving the said Building in Progress as at April 2026.
Amansara North Phase 3 - Certificate of Completion and Compliance obtained on October 2025.
Amansara North Phase 3 - Certificate of Completion and Compliance obtained on October 2025.